Case Study: Compact BOP Handling System

 

 

Customer Location: Shipyard in China

 

Scenario: Customer in China needed a custom BOP Handling System with length & height requirements to meet the following:

  1.   Reduce length of standard unit by 1.3M
  2.   Maintain performance of a standard, original BOP system
  3.   Endure harsh conditions

 

Solution: Custom Designed BOP Handling System

  • Total system length of 2.0 meters instead of 3.3 meters from the standard unit.
  • Speed and consumption equal of the standard 150T hoisting system.
  • Trolleys can fit beams width of 200 mm up to 356 mm.
  • Ex-classification: Ex II 2 GD IIA T3 (X) / Ex II 3 GD IIB T3 (X)
  • Designed as per FEM, ABS, DNV, CE, ATEX requirements.

  

    

Do you need a fully customized BOP Handling System to meet your compact space requirements? Let Ingersoll Rand customize pulling and lifting equipment for you today.